Overlea Boulevard Redevelopment
Full interior redevelopment of an institutional facility: assembly halls, classrooms, feature stair, washrooms and gymnasium.
An Additional Dwelling Unit (ADU) built as a fully self-contained home behind an existing house in Windsor. AZ Construction delivered the project as design-build, from drawings and permits to handover: foundation, structure, building envelope, interiors and site works.
The finished unit includes an open-plan living area and kitchen, three bedrooms, a full bathroom and new concrete patio and walkways.
Gallery
Select any photo to view it full size.
Construction
From footings to finished exterior, in four stages.
Footings, under-slab services, reinforcement and slab pour.
Wall panels, interior layout and engineered roof trusses.
Continuous R10 exterior insulation, taped seams, roofing and windows.
Exterior: siding, soffits, lighting and concrete hardscaping. Interior: drywall, flooring, kitchen, bathroom, millwork and painting.
More projects
Every project shown was delivered design-build: our team prepared the drawings, obtained the permits and managed construction through to handover.
View all projectsFull interior redevelopment of an institutional facility: assembly halls, classrooms, feature stair, washrooms and gymnasium.
Men's washrooms and wudu area rebuilt with quartz, porcelain tile and stainless partitions.
Garage and rear additions, all-new building systems and a modern stone and stucco exterior.
A front extension with arched entry and a full second storey, finished in stone and stucco.
Tell us about your scope and timeline. We respond within one business day.